外文翻译---模具的发展趋势-模具设计(编辑修改稿)内容摘要:

and can intelligently process parameter setting, calibration and other processing results. (3) mold software applications, working trend With the mold in the enterprise petition, cooperation, production and management, globalization, internationalization, and the rapid development of puter hardware and software technology, the Inter has made in the mold industry, virtual design, agile manufacturing technology both necessary and possible. The United States in its 21st Century Manufacturing Enterprise Strategy that the auto industry by 2020 to achieve agile manufacturing / virtual engineering solutions to automotive development cycle shortened from 40 months to 4 months. 2. mold testing, processing equipment to the precise, efficient, and multidirection (1) mold testing equipment more sophisticated, efficient Sophisticated, plex, largescale mold development, testing equipment have bee increasingly demanding. Precision Mould precision now reached 2 ~ 3μm, more domestic manufacturers have to use Italy, the United States, Japan and other countries in the highprecision coordinate measuring machine, and with digital scanning. Such as Dongfeng Motor Mould Factory not only has the capacity 3250mm 3250mm Italian coordinate measuring machine, also has a digital photography optical scanner, the first in the domestic use of digital photography, optical scanning as a means of spatial threedimensional access to information, enabling the establishment from the measurement of physical → model output of engineering drawings → → the whole process of mold making, reverse engineering a successful technology development and applications. This equipment include: secondgeneration British Renishaw highspeed scanners (CYCLON SERIES2) can be realized and contact laser probe plementary probe, laser scanner accuracy of , scanning probe contact accuracy of mm. Another German pany GOM ATOS portable scanners, Japan Roland39。 s PIX30, PIX4 desktop scanner and the United Kingdom Taylor Hopson39。 s TALYSCAN150 multisensor, respectively 6 Threedimensional scanner with high speed, lowcost and functional posite and so on. (2) CNC EDM Japan Sodick linear motor servo drive using the pany39。 s AQ325L, AQ550LLSWEDM have driven fast response, transmission and high positioning accuracy, the advantages of small thermal deformation. Switzerland Chanmier pany NCEDM with PE3 adaptive control, PCE energy control and automatic programming expert systems. Others also used the powder mixed EDM machining technology, microfinishing pulse power and fuzzy control (FC) technologies. (3) highspeed milling machine (HSM) Milling is an important means of cavity mold. The lowtemperature highspeed milling with the workpiece, cutting force is small, smooth processing, processing quality, processing efficiency (for the general milling process 5 to 10 times) and can process hard materials (60HRC) and many other advantages. Thus in the mold processing more and more attention. Ruishikelang pany UCP710type fiveaxis machining center, machine tool positioning accuracy up to 8μm, homemade closedloop vector control spindle with a maximum speed 42020r/min. Italy RAMBAUDI39。 s highspeed milling, the processing range of up to 2500mm 5000mm 1800mm, speed up 20500r/min, cutting feed speed of 20m/min. HSM generally used large, mediumsize。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。