外文翻译--基于单片机的步进电机控制流水线设计(编辑修改稿)内容摘要:

enough and it should be further improved. In the future the packaging machinery has a growing tendency for the application of microputer and electromechanical integration. A plete mechatronics system is a system to integrate multidisciplines such as machinery, puters microelectronics and sensors. It brings profound changes to the design, manufacturing and control of packaging machinery and changes the situation of the order to develop more quickly, something should be done to improve the level of packaging machinery, electromechanical integration, product reliability and stability, and thus the modern packaging industry will be improved. In this work, we simulate the control process of packaging assembly line based on stepper motor which is operated by SCM. First we introduce the overall design of hardware circuit and the main connection of hardware, and then describe the software design and programming ideas, at last we testify the feasibility of the design by experiment, as well as prospect for the future packaging machinery. 2 HARDWARE CIRCUIT DESIGN Overall Circuit Design To facilitate the experiment, the parts of scissors and stepper motor are instead by 9 9 lightemitting diodes. When the lightemitting diodes are light, that means the corresponding ports output high level. While they are not light, that means the corresponding ports output low level. A photoelectric switch is installed on the conveyor belt. If there is no product passing, the infrared receiver and transmitter devices of the photoelectric switch are closed and the output is high level. If some object is passing, the infrared is interrupted and it outputs a negative pulse immediately. Once the input port of SCM detects the negative pulse transmitted by the photoelectric switch, the outputs of SCM will produce special electrical levels controlled by program, transmitting to a driver chip to make stepper motor work. When the packing time is up, SCM outputs a pulse to the relay, making the scissors close so that cutting off the packing tape. After that the scissors open again, waiting for the next action. Main Components Stepper Motor A stepper motor is a machine which transmits electrical pulse signals into angular or linear displacement. The stepper motor can be used as a special motor for controlling other machines because its errors will not be accumulated. It is widely used in a variety of occasions of openloop. STC89C516RD+ SCM is an abbreviation of a singlechip microputer, which is also known as a microcontroller. It is a semiconductor chip, integrated by a CPU, ROM, RAM, I/O interface, timer/counter, interruption systems and some other ponents, constituting a plete digital puter. At present SCM has been successfully used in intelligent instruments, electromechanical devices, process controls, data processing, automatic detection, household appliances and some other fields. In this design we use STC89C516RD+ produced by HongJing Technology Company. STC89C516RD+ has working voltage of 5V, working frequency between 0 to 80MHZ, and its actual working 10 frequency can be up to 48MHZ. L297 To simplify the external circuit, in this design we use a stepper motor driver chip L297 to drive it. L297 is a。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。