外文翻译--模具的发展-模具设计(编辑修改稿)内容摘要:
y. All these have fully demonstrated the development of the State Council and state departments tooling industry attention and support. Mold around the world about the current annual output of 60 billion . dollars, Japan, the United States and other industrialized countries die of industrial output value of more than machine tool 沈阳航空航天大学毕业设计(论文) 14 industry, beginning in 1997, China39。 s industrial output value has exceeded the mold machine tool industry output. According to statistics, home appliances, toys and other light industries, nearly 90% of the parts are integrated with production of chopsticks。 in aircraft, automobiles, agricultural machinery and radio industries, the proportion exceeded 60%. Such as aircraft manufacturing, the use of a certain type of fighter dies more than 30,000 units, of which the host 8000 sets, 2020 sets of engines, auxiliary 20 000 sets. From the output of view, since the 8039。 s, the United States, Japan and other industrialized countries die industry output value has exceeded the machine tool industry, and there are still rising. Production technology, according to the International Association predicts that in 2020, the product best pieces of rough 75%, 50% will be finished mold pleted。 metals, plastics, ceramics, rubber, building materials and other industrial products, most of the mold will be pleted in more than 50% metal plates, more than 80% of all plastic products, especially through the mold into. 沈阳航空航天大学毕业设计(论文) 15 2 The historical development of mold The emergence of mold can be traced back thousands of years ago, pottery and bronze foundry, but the largescale use is with the rise of modern industry and developed. The 19th century, with the arms industry (gun39。 s shell), watch industry, radio industry, dies are widely used. After World War II, with the rapid development of world economy, it became a mass production of household appliances, automobiles, electronic equipment, cameras, watches and other parts the best way. From a global perspective, when the United States in the forefront of stamping technology many die of advanced technologies, such as simple mold, high efficiency, mold, die and stamping the high life automation, mostly originated in the United States。 and Switzerland, fine blanking, cold in Germany extrusion technology, plastic processing of the Soviet Union are at the world advanced. 5039。 s, mold industry focus is based on subscriber demand, production can meet the product requirements of the mold. Multidie design rule of thumb, reference has been drawing and perceptual knowledge, on the design of mold parts of a lack of real understanding of function. From 1955 to 1965, is the pressure processing of exploration and development of the times the main ponents of the mold and the stress state of the function of a mathematical subbridge, and to continue to apply to onsite practical knowledge to make stamping technology in all aspects of a leap in development. The result is summarized mold design principles, and makes the pressure machine, stamping materials, processing methods, plum with a structure, mold materials, mold manufacturing method, the field of automation devices, a new look to the practical direction of advance, so that pressing processing apparatus capable of producing quality products from the first stage. Into the 7039。 s to high speed, launch technology, precision, security, development of the second stage. Continue to emerge in this process a variety of high efficiency, business life, highprecision multifunctional automatic school to help with. Represented by the 沈阳航空航天大学毕业设计(论文) 16 number of working places as much as other progressive die and dozens of multistation transfer station module. On this basis, has developed both a continuous pressing station there are more slide forming station of the press bending machine. In the meantime, the Japanese stand to the world39。 s largest the mold into the micronlevel precision, die life, alloy tool steel mold has reached tens of millions of times, carbide steel mold to each of hundreds of millions of times p minutes for stamping the number of small presses usually 200 to 300, up to 1200 times to 1500 times. In the meantime, in order to meet product updates quickly, with the short duration (such as cars modified, refurbished toys, etc.) need a variety of economictype mold, such as zinc alloy die down, polyurethane rubber mold, die steel skin, also has been very great development. From the mid70s so far can be said that puteraided design, supporting the continuous development of manufacturing technology of the times. With the precision and plexity of mold rising, accelerating the production cycle, the mold industry, the quality of equipment and personnel are required to improve. Rely on mon processing equipment, their experience and skills can not meet the needs of mold. Since the 9039。 s, mechanical and electronic technologies in close connection with the development of NC machine tools, such as CNC wire cutting machine, CNC EDM, CNC milling, CNC coordinate grinding machine and so on. The use of puter automatic programming, control CNC machine tools to improve the efficiency in the use and scope. In recent years, has developed a puter to timesharing by the way a group of direct management and control of CNC machine tools NNC system. With the development of puter technology, puters have gradually into the mold in all areas, including design, manufacturing and management. International Association for the Study of production forecasts to 2020, as a means of links between design and manufacturing drawings will lose its primary role. Automatic Design of die most fundamental point is to establish the mold standard and design standards. To get。外文翻译--模具的发展-模具设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。