居住区交往空间规划与设计外文翻译(编辑修改稿)内容摘要:

re, the sun, and so on. exchanges of highrise building The rising highrise building in the physical environment restrictions on the freedom of the people exchanges, to reduce contact between the residents, the elderly rest, the lack of children39。 s play space. Therefore, the highrise building in the interval to set up a number of similar exchanges in the Chamber of good will to solve these problems. In this way, for the elderly in the rest of the space, to provide children with a playground, and the promotion of social interaction among residents. Roof Garden On the platform set up in the roof garden, an increase of green space, was restored to the construction of the ground. People in this walk, fitness, chat, natural contact, an increase of exchanges between the residents of places to create a multilevel exchanges between the space. 220 yards, a delegation of the association space To achieve effective settlements between the groups and the exchanges have recognized the need for clear and appropriate areas of the border and logo. China39。 s traditional courtyard space is part of building space, the area is a strong sense of space and border patterns, the neighbourhood is to increase exchanges and contacts between the effective means. Beijing Da Zayuan the old mode of living, residents of harmonious relations in harmony, a human face. Renowned architect Wu Liangyong design of the Beijingju infants alley, inheritance and development of this form of living. Shanqiang residential use of the wrong column, platform height difference, changes in residential space, residential settings between Lianlang, plants of the tube, creating a siege without closure, without dredging through the group space and formed a semiprivate, semipublic The field of space. In the courtyard between the layout Zuodeng, the elderly here Xiejiao, Cuxitanxin, no longer feel lonely: reserve some space, children play in the home, mothers can be seen here in the kitchen, children no longer worried about the safety of: Members of mutual Reference , And mutual exchanges, and exchanges are deepseated. Not only enhance the feelings and prevent the formation of a collective consciousness, to effectively prevent the destruction and crime, security, have been protected. So that more people can enjoy the environmental landscape fort, more and more developers are good attention to the landscape of the building. Pichu in the group in a space, as a delegation of the public landscape. However, they often redesign of visual effect light social effect. Although the construction of a large number of hardware shops, flower beds, shrubs planted Joe, it lacks some residents to promote exchanges between the rest of the shelters, chairs, and affected the exchanges between the extension of the neighbourhood. Therefore, the delegation landscape in the strengthening of public infrastructure construction, and create a space for exchanges, will promote exchanges between the residents of outreach. exchanges between the public spaces to create space By the semipublic space to public space, people exchanges between the exchanges from the neighbourhood to the public exchanges, contacts between the characteristics of exchanges between the decision to create a space for the different practices. open space for public relations Residential area of central green space is often the area of public venues, as shared by the entire population, is the residential area of the living room. Here, residents of various gatherings, munity activities, fitness. Open space should be designed, without borders and at the same time, various groups in the residential area green space to the center of the road, should be easily accessible, guide the people into public space, to participate in contacts and exchanges. and landscape bine Pieces Residential area of landscape and people39。 s exchanges with the interaction between people in the landscape before the stop watch, the exchanges have the desire, with the landscape, more full of vigor. Therefore, public exchanges between the space and landscape Pieces should be bined, such as sculpture on the square, around the fountain Waterscape layout Zuodeng, people appreciate the side of sculpture, fountain, while exchanges and reduce the distance between people. At the same time should play a guiding role in the landscape, emphasizing participation, attractive to flow through the landscape, gathering popularity.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。