建筑学外文翻译(2)-建筑结构(编辑修改稿)内容摘要:
ut Sea and water features that affect the tropical beach resort overall layout of the important factors, such as sea view location, the hotel building and sand transport connections, swimming pools and water sports and so on. Not only determines the orientation of sea room towards the hotel39。 s location also decided to not only sea view rooms for the same time by the lobby, restaurants and other public space needs, this seaside resort is the key to the success of the design. Contact the hotel and the beach is the hotel embodies the value. The best contact is the beach as the hotel39。 s back garden, hotel rooms can have a stretch of sea. This connection to the hotel and the beach can be the most closely connected, so naturally the traffic outside the hotel and the hotel itself, the traffic separate. This connection is the most favorable for the hotel connection. Yalong Bay39。 s Horizon, Sheraton, Holiday, a four, fivestar hotel to have this advantage, they are flat in the design of the total full use of this condition, the layout of a large number of outdoor activities between the hotel and the beach, and highlights the unique charm of the tropical beach hotel. Direct contact relative terms, indirect connection, as between the hotel and the beach outside the hotel by public transport through the influence of the hotel39。 s own organization and room traffic landscape, so that links the hotel with sea view is relatively weak. This connection, the total graphic design in addition to considering the focus on sea view or a scene, the hotel39。 s own environment and atmosphere to create a shape on a higher requirement, water features, swimming pools, water sports facilities by the utmost importance. Swimming pools and water features designed in the seaside resort as a whole played a finishing point. The hotel is the hotel swimming pool and water feature design the visual focus of garden design is the strongest of their participation in sexual outdoor activities project. Environmental design outside the hotel swimming pool with water features start to the center, bined with water bar, outdoor dining, water sports area and other activities constitute a hydrophilic region, the characteristics of the formation of beach resorts. 23 建筑的风格和装饰海南海滨度假酒店的建筑风格虽然各具特色,但它们在根本上却有着共性。 海南作为中国特有的气候区,当地的建筑有着其独特的地域性,通过对传统建筑的分析,提取出最能体现表现力的要素:因排水需要而衍生出的倾斜屋面。 满足阴影和遮蔽要求的深挑檐。 为除湿和换气而设的通风口。 纹理别致的墙面。 当地民族文化。 所有这些元素贯穿在传统热带建筑的各个发展阶段,传递着个性与情感,使得这类建筑风格存在强烈的共性。 在这一思想的影响下室内装饰的风格也多以展现浓郁热带风情的东南亚室内装饰风格为主。 室内装饰材料以给人凉爽舒适感觉的天然石材,及就地取材的木质材料为主,在白墙灰瓦及原木的背景下布置布艺、藤质、木质沙发及家具,配以色彩鲜艳的靠垫及装饰品,常绿的热带植物及花卉很好地烘托了气氛,限定了不同功能组别空间的作用,整体色调浓烈而又亲切,与其所处的热带自然环境协调统一,共同营造出低纬度地区酒店建筑装饰风格的独有魅力。 翻译:2 • 3 architectural style and decoration Hainan Beach Resort Although the distinctive architectural style, but they have a mon root is. Hainan, China as a unique climate, local building has its unique regional, traditional architecture through the analysis, to extract the most expressive elements of expression: the needs for water derived from the tilted roof。 to meet the shadow and shelter requirements deep eaves。 for the dehumidification and ventilation vents designed。 texture and unique wall。 local culture. All of these elements in the traditional tropical architecture throughout all stages of development, convey personality and emotion, makes the existence of such a strong mon architectural style. Under the influence of this thinking style is more interior to show strong tropical Southeast Asia, mainly interior decoration style. Interior materials to give the cool fort of natural stone and local materials of woodbased materials, the white walls and gray tiles and wood in the background layout cloth, cane quality, wooden sofa and furniture, together with the colorful cushions and ornaments, evergreen tropical plants and flowers contrast well the atmosphere, limits the role of different functional groups of the space, but the overall strong warm tone, with its tropical environment in which the harmonization, cocreate a lowlatitude Area Hotels architectural style unique charm.3 设计实践笔者在海南博鳌曾经参与设计海滨度假酒店———广铁博鳌培训中心(图3),且该设计是本项目在全国的设计投标中的中标方案。 它也是笔者将海滨酒店的设想运用于设计实践中的实例。 图3 海南广铁集团博鳌培训中心 该中心是按照四星级标准结合疗养培训功能建立的旅游度假酒店。 基地紧邻海滨,海滨海水及沙滩条件良好,只需稍加整理即可成为优质的海滨浴场。 设计中遵循以海景为外部环境依托,园林绿化与建筑有机结合,营造良好的内部空间。 着重于合理布置客房,使绝大多数房间得以享受无尽海景。 对海景的利用不但充分体现在客房的布置上,同时也针对所有餐厅(中、西餐、茶座),使得“中心”海滨度假的优势得以淋漓尽致的发挥。 康乐培训和医疗在轻松愉快的气氛中进行98建筑科学第22卷 翻译:Design Practice 3 I have been involved in the design in Boao, Hainan Beach Resort Canton Boao training centers (Figure 3), and the design is the design of the project in the country in winning the tender program. It is also the author used the idea of the seaside hotel design practice examples. Figure 3 Boao, Hainan, Guangzhou Railway Group • Training Center The center is a fourstar standards in accordance with the training functions bined with the establishment of convalescent tourism resort. Base close to the beach, coastal waters and beaches in good condition, just a little order can bee a quality beach. Follow the sea for the design relies on the external environment, landscape and architecture bine to create a good internal space. Focus on the rational layout of rooms, so most of the room to enjoy the endless sea. The use of the sea not only fully reflected in the arrangement of the rooms, but also for all restaurants (Chinese, Western, cafe), the center the advantages of coastal resorts to play vividly. Recreation and medical training in a relaxed atmosphere 98 Building Science Volume 22 海南岛的热带气候特点以及当今世界环保节能可持续发展的要求,在设计中得以充分的体现,开敞的厅廊,大面积窗及百叶地运用,充分利用自然通风采光以达到人与自然的和谐。 公共部分包括大堂、餐厅、多功能厅、康乐等大空间均以自然的空气对流代替人工的空调。 多个空间之间的联系均采用敞廊相连。 内庭布置大面积的泳池、水景来营造良好的小气候环境。 靠海一侧的底层全部开敞让内庭充分呼吸到大海的气息。 [1]中这样叙述:自然环境、建成环境、地方材料、文化特征、情绪和奇妙的感觉、太阳的光亮和透明度、色泽耀眼的透明天空、暴风雨前素淡阴沉而又不失生动的水平线,还有蓝色的群山,这些都是构成热带地区空间特征的要素。 海南岛的独特地理位置和气候人文条件正是符合了这些要素,我们所追求的建筑不仅应该考虑地方环境要素,而且要加强其表现力,使本地区的形象强烈而独特。 热带建筑的表现就应当传达这样的意念。 翻译:Hainan Island39。 s tropical climate characteristics and the curr。建筑学外文翻译(2)-建筑结构(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。