机械加工毕业设计外文翻译--淬硬齿轮的加工(编辑修改稿)内容摘要:
sor digital actuation system。 The straight line rolls the guide rail system。 High speed automatic highquality goods (2 ~ 3 seconds)。 The occupying a land area of is pact。 According to manmachine engineering design。 Services conveniently. Uses scrapes the craft Regardless of is the mechanical type the CNC gearhobbing machine all can carry on scrapes, but the condition is the engine bed must equip has the work piece to the cutting tool selsyn train system. This may cause to scrape the craft economically, to has on the automatic yummy treats system the engine bed very to be also important. The electronic non contact system depends on a simulation quantity sensor to send out the pulse to survey the cutting tool main axle, the work piece main axle and the gear position. The engine bed CNC controller carries on processing to these pulses, then is opposite to the work piece main axle in the cutting tool position carries on the adjustment, causes a work piece turn of tooth and the hob knife tooth relative position relations is correct. In scrapes in the craft to have very many merits with the refrigerant: In scrapes in the process, the refrigerant has provided the lubricating ability。 Because scrapes produces is not the normal scrap, the temperature control is extremely important. Blows the scrap small is thin, does not look like normal knife filings such to be possible to carry off many quantity of heats, therefore scrapes time uses the refrigerant to be possible to control the cutting tool, the work piece and the engine bed system temperature。 The refrigerant may washes away the scrap from the cutting tool and the work piece。 Improved the work piece surface fine roughness。 Enhanced the cutting tool life. Rolls in the green truncates in the craft, correctly chooses the tooth thick remainder is very important. The remendation choice down milling rolls the tooth, because it may obtain the thickest scrap, this is helpful to the control cutting process dynamic condition, enhances the cutting tool life. The experience proved that, the cutting speed may surpass 200m/Min, enters for the quantity choice is decided by the superficially attractive fineness which must achieve. The model enters for the scope is ~ (flees knife) the method very to be also important, because scrapes time only then the rough machining section partial cutting edges only then undergo the attrition. On the contrary, in the green cutting in the process, the cutting tool precision work has partially undertaken the main process load. This meant when scraping flees the knife quantity to be supposed to be bigger, when like the gear is 12 ~ 48DP, each time flees the knife quantity is ~ . Scrapes the hob the selection Scrapes the hard alloy hob to divide into two big kinds: Uses in 10DP or the bigger modulus hob, usually all designs has a negative rake front the cutting, when the cutting edge contacts to the hard tooth face, reduced to the hard alloy material impact。 Regarding the small modulus gear, does not need to have the negative rake. The negative rake hob shorting is sharpens the difficulty. After the hob sharpens the outer diameter to reduce, in order to obtain the correct negative rake to be supposed to change t。机械加工毕业设计外文翻译--淬硬齿轮的加工(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。