机械设计外文翻译----圆弧型柔性铰链刚度特性分析(编辑修改稿)内容摘要:
model left end surface is restrained pletely, the right end surface exerts bending moment NmM . The special node 1 of the grid model right end surface represents the output displacement. The unit type chooses 3_D the entity SOLID92 unit model, the entire model usrs Smartsize to free mesh. The deformation of the FEA model is shown in Figure 2(b). The FEA model and the output displacement have been obtained with changing elliptical flexible hinge’s paramters E,b,t and x as well as y (a) (b) Figure 2 . FEA model of elliptical flexure hinge The theoretical calculation and FEA rotational stiffness are obtaoned through changing elliptical flexure hinge’s parameters E,b,t and x as well as y , as shown in Figure 3 to 7. Figure 3. Comparison of FEA value and the theoretical value of flexure hinge with changing E Figure 3. Comparison of FEA value and the theoretical value of flexure hinge with changing width b Figure 5. Comparison of FEA value and the theoretical value of flexure hinge with chinging thickness t Figure 6. Comparison of FEA value and the theoretical value of flexure hinge with chinging semimajor axis x Figure 7. Comparison of FEA value and the theoretical value of flexure hinge with chinging semimajor axis y From Equation (3) and Figures 3 to 7 the following conclusions can be observed. (1) From Figures 3and 4 it can be observed that the rotation stiffness is a linearly increasing realtion with material young’s modulus E and width b. The FEA value is bigger than the theoretical value. When E and b are smallerm the FEA value and the theoretical value are closer . (2) From Figure 5 it can observed that the rotantion of the stiffness FEA value and the theoretical value is a vurve increasing with thickness t, end the speedup is getting quicker and quicker. When t is bigger, the difference of the theoretical value and the FEA value is bigger. When t2mm, the FEA value and the theorerical value are close. (3) From Figure 6 it can observed that the rotantion of rotation rigidity and semimajor axis x is a decreasing curve, and the rate of reduced scope is gradually decreased. When x 3mm, the FEA value and the theoretical value are closer. (4) From Figure 7 it can observed that the rotantion of rotation ridity and semiminor axis y is a linearly increasing, but the increasing scope is small. The FEA value is bigger than the theoretical value. From Figure 3 to 7 it can obse。机械设计外文翻译----圆弧型柔性铰链刚度特性分析(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。