Yakdoc Plastic Welding
  • Home
  • Kayak Repair
  • Motorcycle repairs
  • Contact
  • About
  • Blog articles

A badly melted bow.

This Kayak was badly melted by a bus exhaust pipe when it was stored on the roof.
This Kayak was badly melted by a bus exhaust pipe when it was stored on the roof.

With the melted plastic cut out a large hole was left
With the melted plastic cut out a large hole was left.


A patch was made using a cardboard template to get the exact shape
A patch was made using a cardboard template to get the exact shape

The patch was tacked in place then welded at the bottom,
The patch was tacked in place then welded at the bottom,

The patch was curved using a blowtorch and tacked in place before being welded in permanently, this was done in stages to get the right shape.
The patch was curved using a blowtorch and tacked in place before being welded in permanently, this was done in stages to get the right shape.

The finished job and the customer is now out on the water again.
The finished job and the customer is now out on the water again.



Kayak hull with two deep gouges in it.
Badly gouged kayak hull
These deep gouges needed repairing.

Kayak with gouges plastic welded
Here one gouge has been repaired and the other has a fresh plastic weld in it.

kayak hull with gouges repaired
The finished repair, if you look hard you can see it.


Post by Yakdoc Plastic Kayak and Canoe repairs www.yakdoc.com.

Split scupper tube resleeving
Kayak with badly split scupper tube.
This kayak had badly split scupper tubes.

Kayak with a new scupper  insert welded in place.
Kayak with a new scupper  insert welded in place.

My own kayak, both scuppers split top to bottom
My own kayak, both scuppers split top to bottom

Kayak repaired  in 2010 and still in use today.
Kayak repaired  in 2010 and still in use today.


Bashed in bow repair

Kayak with a cracked and bashed in bow.
Kayak with a cracked and bashed in bow.

Kayak repaired and watertight again.
Kayak repaired and watertight again.

This kayak was leant against the hot water service.

Kayak with a large melted area
Kayak with a large melted area.

Kayak with no access from inside the hull the patch was welded to the out side of the hull and know is part of it.
Kayak with no access from inside the hull the patch was welded to the out side of the hull and is now part of it.

Kayak melted damage cut out ready for patching
Kayak melted damage cut out ready for patching.

A badly dented hull from tight straps in the sun

Canoe with dents in the hull from tight securing straps.
Canoe with dents in the hull from tight securing straps.

Picture
Canoe looking much better after being propped in the sun on supports  for a few days.

Worn out bow

Kayak with worn out bow.
Kayak with worn out bow.

Kayak bow repaired with 3mm thick reinforcing.
Kayak bow repaired with 3mm thick reinforcing.

Powered by Create your own unique website with customizable templates.