Yakdoc Plastic Welding
  • Home
  • Repair Galleries
  • Contact
  • About
  • facebook galleries
  • Blog articles
  • LINKS
  • Krakka Yakkaz Fishing
  • Pinterest

Skips kayak repaired

10/3/2014

0 Comments

 
split kayak
This is Skip's kayak with badly split scupper tubes, a few weeks ago I  repaired it by resleeving the scupper tubes.
  Labour day long weekend  he launched from the east side of Westernport and even though he misjudged the tides and had to push it back in through 130 meters of knee deep mud, he was happy with his catch
of a good size Gummy, a decent elephant shark and a nice pinky snapper.
The yak although very muddy stayed dry on the inside.
Well done Skip, enjoy your fisherman's basket dinner and perhaps read the tide charts.

Cheers Doc.

muddy dirty kayak
That's going to take some cleaning.

kayak fishing
Good to see a repair job back on the water and catching fish.

0 Comments



Leave a Reply.

    Categories

    All
    Bow And Keel Wear
    Kayak Carts
    Kayak Detailing
    Keep Your Offcuts
    Leak Testing A Kayak
    Plastic Compatibility
    Plastic Scratch Removal
    References

Proudly powered by Weebly