Yakdoc Plastic Welding
  • Home
  • Kayak Repair
  • Motorcycle repairs
  • Contact
  • About
  • Blog articles

 bow and keel wear.

19/1/2014

0 Comments

 
kayak with worn out bow
Loading or unloading your kayak on hard gravel or the road will often cause the bow or keel to wear through as in the case in this kayak bow.

kayak on car floor mat
Using a rubber or plastic car mat between the hull and the ground will definitely reduce if not eliminate damage to your hull caused by loading or unloading on rough surfaces.

0 Comments



Leave a Reply.

    Categories

    All
    Bow And Keel Wear
    Kayak Carts
    Kayak Detailing
    Keep Your Offcuts
    Leak Testing A Kayak
    Plastic Compatibility
    Plastic Scratch Removal
    References

Powered by Create your own unique website with customizable templates.